In compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments thereto, IM-00MS(20), Dade County has been surveyed with respect to archaeological resources, especially those on or eligible for inclusion in the National Register of Historic Places (NRHP) . The purpose of the survey was to locate, identify and evaluate the significance of any archaeological resources within the proposed project's area of potential environmental effect.

The proposed project consists of the replacement of three bridges and widening their approaches at the I-24/I-59 interchange in Dade County. The three bridges included in the proposed project are the bridge on I-24 EB over the ramp from I-59 NB to I-24 WB, I-24 EB over the ramp from I-24 WB to I-59 SB, and I-59 SB over the ramp from I-59 NB to I-24 WB. The existing right-of-way is approximately 91. 4 m (300 ft). No additional right-of-way would be required for the completion of the proposed project. An archaeological survey consistent with the project description was conducted along the entire project corridor.

An archaeological survey (Level I) was conducted in accordance with "GOOT/FHWA Cultural Resource Survey Guidelines" developed by the GOOT Staff Archaeologists in consultation with DNR Historic Preservation Section Staff and concurred in by the Federal Highway Administration and State Historic Preservation Officer. These guidelines provide general survey boundaries and methodological approaches to archaeological surveys based on the type/scope of proposed highway projects and are followed during the initial identification of archaeological resources.

No existing or eligible National Register archaeological resources were located within the project's area of potential environmental effect. It is concluded, therefore, that the project will have no effect upon archaeological resources on or eligible for inclusion in the NRHP provided that the project conforms to that described above.