Back to top

Phase I Archaeological Survey of the Proposed SR 122 Bridge Replacement over Mule Creek, Brooks County, Georgia

Author(s)
Report Number
12677
Year of Publication
2018
County
Abstract

This project will replace the existing bridge on SR 122 over Mule Creek, which is 2 miles east of Pavo, with a new bridge using two 12-foot lanes and 6-foot shoulders on both sides. The roadway section will include two 12-foot lanes with 6-foot rural shoulders (2-feet paved, 4-feet grassed). The total length of the project is 1,700 feet. SR 122 will be closed while constructing the new bridge at the same location as the existing bridge, and the traffic will use designated offsite detours. This road closure will need to be coordinated with the road closure for project PI 0013802, which is on SR 122 and approximately 6 miles east of this project.