Back to top

Archaeological Survey of Proposed Foot Bridge at US 78 at Yellow River, Gwinnett County, Georgia

Author(s)
Report Number
1307
Year of Publication
2007
County
Abstract

The project consists of constructing a pedestrain bride on the north side of US 78 where it crosses the Yellow River. All construction will occur within the existing 75-foot wide US 78 right-of-way. The total length of the project is 360 feet. The area of potential effect is the width of the existing right-of-way on the north side of US 78, extending 50 feet west and 190 feet east of the existing highway bridge. The span of the bridge is 120 feet.