Back to top

Archaeological Survey of Project BRF-034-1(13), Lowndes County

Author(s)
Report Number
13133
Year of Publication
1979
Abstract

Cherry Creek crossing State Route 125 near Valdosta, Georgia.  Replace existing 1401 x 241 concrete bridge (with timber piling) with triple 101 x 61 concrete bridge culvert.  Place approximately 3200 cu. yds. of fill material below the 100-year flood elevation covering approxi­mately 0.500 acres. Fill material will be obtained from high land sources in vicinity of project.  Erosion control will be grassing on shoulders and slopes and baled straw where needed.