Archaeological Assessment of Project FR-030-2(23), Crisp County

Report Number
13245
Year of Publication
1991
County
Abstract

On S.R. 30/U.S. 280 in Crisp County and additional 12' lane will be constructed from milepoint 14.7 to milepoint 16.2, and a westbound passing lane will be constructed from milepoint 17.0 to milepoint 18.5. A total distance of three miles. A triple 8' X 5' concrete bridge culvert, a 5' X 4' and a 3' X 3' concrete box culvert will be lengthened on the side the roadway is widened. Existing right-of-way is 100'. Shoulders on the widened side will be constructed to 10' while the shoulders on the non-widened side will be retained.