Back to top

Phase I Archaeological Survey for the Proposed Bridge Replacement at CR 11 over Swift Creek, Crisp County, Georgia

Author(s)
Report Number
14612
Year of Publication
2021
County
Abstract

The proposed project would consist of the replacement of the bridge carrying County Route (CR) 11/Lower Pateville Road over Swift Creek Tributary in Crisp County, Georgia (Figure 1). The existing bridge was constructed in 1932 with concrete decking and steel beams. The existing typical section for CR 11/ Lower Pateville Road consists of two 7-foot (ft) (2.13 meters [m]) dirt travel lanes with approximately 5-foot (ft) (1.52 meters [m]) wide, grassed, rural shoulders. The existing right-of-way (ROW) is approximately 25 feet (ft) (7.62 meters [m]), and the proposed ROW will be determined as project plans develop.