Back to top

Archeological Reassessment of Project BR-0003-00(91), Bulloch County

Author(s)
Report Number
3205
Year of Publication
2005
Abstract

Archeological Reassessment of Project BR-0003-00(91), Bulloch County. This project was originally surveyed and concurrence received in July of 2004, then reevaluated with concurrence received in February of 2005. The proposed project consists of the replacement of a structurally deficient bridge on CR 153 over Wateringhole Branch. The existing bridge is 105' x 23.9' on 80' of right-of-way, while the replacement bridge will he a 125' x 44' bridge on new location directly north of the existing bridge. An additional 60' of right-of-way is required on the north side on the roadway for the implementation of this proposed project. The original project remains the same except for the following: temporary easements and temporary driveway easements are now required, varying is size from 10' to 40' in width and 70' to 500' in length. Total project length remains at 0.4 mile.