Back to top

Phase I Archaeological Resources Survey Woodstock Parkway Interchange

Report Number
3582
Year of Publication
2006
Abstract

This is a GDOT Archaeological Report Short Form for Negative Findings of a Phase I Archaeological Resources Survey of the Woodstock Parkway Interchange in Cherokee County. The proposed project would construct a new full diamond interchange on I-575 between the existing interchanges at Towne Lake Pkwy (Exit 8) and Sixes Road (Exit 11) at the existing Woodstock Pkwy overpass. In addition, new auxiliary lanes will be constructed between the new interchange and the Towne Lake Pkwy interchange. The new lanes will cover the full extent between the two interchanges on the south bound side and the north 1/3 (approximately 2000 feet) of the distance between the two interchanges on the north bound side. The proposed project would also realign Old Rope Mill Road to intersect with Ridgewalk Pkwy approximately 525 feet to the east of the existing intersection to accommodate the proposed interchange ramps. A new road, Parodi Place, will be constructed off Woodstock Pkwy. The total project length would be approximately 9,300 feet (1.76 miles).