Archaeological Reassessment of Project STP-114-2(13), Stephens County

Author(s)
Report Number
3695
Year of Publication
2006
Abstract

The proposed project was originally surveyed and concurrence received in 1996, the reassessed with concurrence received in 1999. the original project remains the same except for the following: the northeast terminus of the Toccoa Bypass has been shifted further northeast to better line up with CR 522. New right-of-way is required varying in width from 210' to 250' and approximately-400' in length. An archeological survey (Level II) was conducted in accordance with "GDOT/FHWA Cultural Resource Survey Guidelines" developed by the GDOT Staff Archeologists in consultation with DNR Historic Preservation Division Staff and concurred in by the Federal Highway Administration and State Historic Preservation Officer. These guidelines provide general survey boundaries and methodological approaches to archeological surveys based on the type/scope of work of proposed highway projects and are followed during the initial identification of archaeological resources. No existing or eligible National Register resources were located within the project's area of potential environmental effect. It is concluded, therefore, that the project will have no effect upon archeological resources on or eligible for inclusion in the NRHP provided that the project conforms to that described above.