Ph. I Arch. Survey of SR 135 Douglas Bypass Widening, Coffee County, Georgia

Author(s)
Report Number
4189
Year of Publication
2007
County
Abstract

The proposed project would consist of the widening of the SR 135 bypass corridor from a two-lane roadway (one travel lane in each direction) to a four-lane roadway (two travel lanes in each direction) on the south side of Douglas, Coffee County. The project would begin at SR 31/US 221/US 441 and continue northeast to SR 32. The length of the proposed project would be approximately 2.5 miles. Existing right-of-way is approximately 160 feet to 200 feet. Proposed right-of-way would be 200 feet to 250 feet wide. Signaled and Stop-sign controlled intersections along the corridor would be improved, and a bridge would be constructed to provide a grade separation at the railroad crossing. This railroad grade separation would require the elimination of direct access from the side streets to SR 135 for approximately one-quarter mile (0.25) mile on either side of the railroad.