Archaeological Survey of Project STP-0003-00(786), Floyd County

Author(s)
Report Number
5838
Year of Publication
1996
County
Abstract

The overall proposed project would consist of reconstructing the SR 53 median cross over at its intersection with CR 159 from adjacent left turn lanes to offset left turn lanes with right turn lanes being added to both northbound and southbound approaches. The total project length. is 0.35 mile. An archaeological survey (Level II) was conducted in accordance with "GDOT/FHWA Cultural Resource Survey Guidelines" developed by the GDOT Staff Archaeologists in consultation with DNR Historic Preservation Division Staff and concurred in by the Federal Highway Administration and State Historic Preservation Officer. These guidelines provide general survey boundaries and methodological approaches to archaeological surveys based on the type/scope of work of proposed highway projects and are followed during the initial identification of archaeological resources. No existing or eligible National Register resources were located within the project's area of potential environmental effect. It is concluded, therefore, that the project will have no effect upon archaeological resources on or eligible for inclusion in the NRHP provided that the project conforms to that described above.