Back to top

Capps Ferry Road Bridge Emergency Repairs

Report Number
5874
Year of Publication
1985
Abstract

This project consisted of the emergency removal of flood deposited debris from the deck of the bridge over the Chattahoochee River on Capps Ferry Road (Figure 1). All work was completed October 2, 2009 and it took place within the existing 140-foot right-of-way.