Addendum to Phase 1 Archaeological Survey for Improvements to SR23 from I-16 to Lytell Street Candler County, Georgia

Author(s)
Report Number
5878
Year of Publication
2006
County
Abstract

The proposed project is located in the City of Metter, Georgia. The project would begin at the 1-16 West exit ramp and end at the intersection of SR 23/121 and Stripling Street. The total project length is approximately 4,365 feet (0.83 mile). The existing SR 23/121 has four 11-foot travel, lanes with variable width grassed shoulders and ditches. The existing right-of-way tapers in from the 1-16 Interchange right-of-way to vary between 100 to 120 feet. The proposed project would widen SR 23/121 to a five-lane urban undivided roadway with two 12-foot through lanes in each direction and a 14-foot two-way left turn lane. The proposed roadway would have urban shoulders including 30-inch curb and gutter, a two-foot grass strip, and five-foot sidewalks. The proposed right-of-way would taper in from.the 1-16 interchange right-of-way to vary between 100 to 160 feet. The five-lane section would end at Lytell Street by creating a right-turn bay northbound and adding a lane southbound. The remainder of the width is tapered out from Lytell Street to Stripling Street. The proposed project would require approximately 0.872 acre of right-of-way, 0.515 acre of permanent easement, 0.022 acre of temporary construction easement, and 0.589 acre of temporary driveway easement.