Back to top

Phase 1 Archaeological Survey of Improvements at I-575 and Barrett Parkway, Cobb County

Author(s)
Report Number
5890
Year of Publication
1996
County
Abstract

The proposed project consists of the widening of westbound Barrett Parkway to allow for an eight-foot raised median and the construction of an exclusive westbound lane from the 1-575 southbound exit ramp to the Mall Boulevard intersection. The 1-575 southbound ramp would be widened to create an additional right-turn lane between the 1-575 southbound exit ramp and Mall Boulevard and a southbound left-turn lane would be added on Mall Boulevard. Curb and gutter, a 5-foot sidewalk with 1.5-foot stamped and colored concrete strip, and a gravity wall would be constructed on the northern side of Barrett Parkway. A 4-foot raised median and 5-foot sidewalk would be constructed along the western side of Mall Boulevard. Existing ROW along Barrett Parkway is 144 feet and 80 feet along Mall Boulevard.