Back to top

Archaeological Assessment of Project EDFR-023-1(8) and (9), Coffee/Atkinson Counties

Author(s)
Report Number
6005
Year of Publication
2010
County
Abstract

This project proposes to widen U.S. 441/S.R. 31 from U.S. 82 in Pearson to the current 4 lane in Douglas -- a distance of 12.5 miles. A corridor consistent with the proposed rights-of-way was surveyed for the entire length of the project. An archaeological survey (Level I ) was conducted in accordance with "GDOT Archaeological Survey Guidelines" developed by the GDOT Staff Archaeologists in consultation with DNR Historic Preservation Section Staff and concurred in by the Federal Highway Administration and State Historic Preservation Officer. These guidelines provide general survey boundaries and methodology approaches to archaeological surveys based on the type/scope of proposed highway projects and are followed during the initial identification of archaeological resources. No significant archaeological resources were located within the proposed project corridor as described in paragraph two above. It is concluded, therefore, that the project will have no effect upon archaeological resources on or eligible for inclusion in the NRHP provided that the project conforms to that described above.