Back to top

Archaeological Survey of NH-STP-014-1(60), Clarke County

Author(s)
Report Number
6050
Year of Publication
2010
Abstract

The proposed project would surplus a 2.909 acre GDOT owned parcel in the southeast quadrant of the US 78 and Epps Bridge Parkway intersection. The parcel is severely disturbed by past development including building construction, parking lot constructions, and driveway construction. An archaeological survey (Level I) was conducted in accordance with "GDOT/FHWA Cultural Resource Survey Guidelines" developed by the GDOT Staff Archaeologists in consultation with DNR Historic Preservation Section Staff and concurred in by the Federal Highway Administration and State Historic Preservation Officer. These guidelines provide general survey boundaries and methodological approaches to archaeological surveys based on the type/scope of proposed highway projects and are followed during the initial identification of archaeological resources. By agreement, because no archaeological resources were located within the project's area of potential effect, no signed concurrence from the State Historic Preservation Office is required. It is concluded, therefore, that the project will have no effect upon archaeological resources on or eligible for inclusion in the NRHP provided that the project conforms to that described above.