Back to top

Archaeological Assessment of Project DPI-0010(001) Ct. 29, Cobb County

Report Number
6308
Year of Publication
1984
Abstract

The proposed project would consist of the installation of both aerial and underground communication conduit and fiber optic cable', _and video surveillance cameras along Windy Hill Road. The proposed project would begin at the intersection of 1-75 and continue west to Austell Road to the intersection of County Farm Road which it follows to end at the Cobb County TCC. No additional right-of-way will be required for the completion of this project. An archaeological survey consistent with the project description was conducted along the entire project corridor. An archaeological survey (Level I) was conducted in accordance with "GDOT/FHWA Cultural Resource Survey Guidelines" developed by the GDOT Staff Archaeologists in consultation with DNR Historic Preservation Section Staff and concurred in by the Federal Highway Administration and State Historic Preservation Officer. These guidelines provide general survey boundaries and methodological approaches to archaeological surveys based on the type/scope of proposed highway projects and are followed during the initial identification of archaeological resources. No existing or eligible National Register archaeological resources were located within the project's area of potential environmental effect. It is concluded, therefore, that the project will have no effect upon archaeological resources on or eligible for inclusion in the NRHP provided that the project conforms to that described above.