Addendum: Phase I Cultural Resources Survey and Archeological Inventory Investigations Conducted at the Wild Plum Road Exit Extra Work Space and Additional Area at Wareyard #3, Associated with the 10.24 (6.36 mi) long 30-in O.D. Triangle Pipeline Project

Report Number
6842
Year of Publication
2003
Abstract

This document presents the results of an additional Phase I cultural resources survey and archeological inventory consisting of a proposed 0.34 ha (0.83 ac) extra work space designated the Wild Plum Road Exit work space and an additional 0.8 ha (2 ac) of area that is situated at proposed Wareyard #3. Both of these project items are associated with the proposed 10.24 km (6.36 mi) long 30-in O.D. Triangle Project pipeline. No archeological sites or historic standing structures were identified as a result of this survey; therefore, no additional testing of the proposed project items is recommended.