Back to top

Addendum Phase I Archaeological Survey for Proposed Bridge Replacement Site at SR 323

Author(s)
Report Number
7605
Year of Publication
1986
Abstract

The proposed project is located along SR 323 at Grove River, approximately 6.5 miles west of Homer in Banks County, Georgia. The proposed project would replace the existing 28-foot wide bridge with a new 34-foot wide bridge. The new bridge would be shifted parallel (North) of the existing which would minimize environmental impacts. The proposed bridge would consist of two 11- foot travel lanes with 6-foot rural shoulders and will be 200 feet long. Existing ROW is 100 feet, and proposed ROW would be 150 feet. No temporary bridge will be constructed . The proposed project length would be approximately .60 miles.