Addendum to Phase I Archaeological Survey of the I-75/Jodeco Road Interchange, Henry County

Report Number
7834
Year of Publication
2012
Abstract

The current project consisted of two minor changes to the original plans for the 1-75 and Jodeco Road interchange that was originally surveyed by Hamby (2003; 2007). First, the proposed alignment of Jodeco Road has been shifted approximately 200 feet north of the existing right-of-way in the area of the 1-75 south bound off-ramp (Figure 2). This allows for the construction of a new realigned bridge across 1-75. The proposed realignment begins approximately 1450 feet west of the 1-75 center line and extends approximately 2150 feet east of the center line to Meadowbrook Drive. Second, a section of a roadside drainage ditch running east 350 feet from Meadowbrook Drive on the north side of Highland Drive would be reconstructed as a storm sewer pipe (Figure 2).