Back to top

Archaeological Reassessment of. GDOT Project NH-JM-18-5-1(317)(326), Muscogee County

Author(s)
Report Number
8255
Year of Publication
2011
County
Abstract

This project was originally surveyed and concurrence received in September of 1997, then reevaluated with concurrence received in March 2005. The areas of the project located within the boundaries of Fort Benning have been previously surveyed and cleared for archaeological resources (see attachment email). The original project remains the same, except for the following: Unit (326) I-185@ US 27/,SR 1 Victory Drive Interchange- new right-of-way required varying in width from approximately 10' to 190' for a total distance of 1.04 miles; Unit (317) 1-185 from Victory Drive to St. Mary's Road- new right-of-way required varying in width from approximately 30' to 200' for a total distance of 0.88 mile, a sediment basin approximately 312' by 110', and a temporary easement approximately 525' by 138'.