Archaeological Reevaluation or Project NH-IM_-475-1 (247), Bibb County

Author(s)
Report Number
8661
Year of Publication
2011
Abstract

The proposed project would widen Zebulon Road and the Zebulon Road bridge over I-475 in Bibb County. The project would begin 450 feet east of the I-475 northbound exit and entrance ramps and end at Lake Wildwood Drive for a total distance of 0.5 mile. The existing right-of-way is 130 feet. The required right-of-way would be 150 feet. Lamar Road on the east side ofl-475 would also be relocated to tie into an existing drive. This reevaluation was concerned with an extension of the western project limits by approximately 750 feet. The proposed project will end at a point approximately 750 feet west of Lake Wildwood Drive. There will also be a minor amount of right-of-way and easements required on the I-475 southbound entrance ramp and a minor easement required on the southbound exit ramp. These proposed project changes were surveyed for cultural resources.