Archaeological Reassessment of Project STP-ERP-030-2(40), Sumter County

Author(s)
Report Number
8680
Year of Publication
2013
Abstract

The proposed project would raise a section of SR 30/US 280 approximately 6 feet to alleviate flooding. The original project began approximately 1700 feet east of Whiskey Store Road and terminated approximately 3500 feet east of Whiskey Store Road. The proposed project has been increased by approximately 1800 feet, for a total distance of approximately 0.66 mile. Existing right-of-way varies from 100 to 110 feet. Required right-of-way would include a maximum of 160 feet. An archaeological survey consistent with the proposed changes was conducted for the entire length of the project corridor.