Archaeological Assessment of Project STP-032-2(29), Brooks/Colquitt Counties

Report Number
8700
Year of Publication
2015
Abstract

The proposed project would consist of the construction and paving of 0.6 m (2 ft), left and right on SR 133 in Brooks and Colquitt Counties. The proposed project would begin approximately 0.55 km (0.34 mi) south of CR 344 (MP 1.09) in Brooks County and would end approximately 0.36 km (0.22 mi) north of CR 111 in Colquitt County. Existing right-of-way is approximately 30.5 m (100 ft). No additional right-of-way would be required for the completion of the proposed project. An archaeological survey consistent with the project description was conducted along the entire project corridor.