Addendum to Archaeological Reassessment of Project STP-Q14-1(62) dated June 1, 2007

Report Number
8840
Year of Publication
2007
County
Abstract

This project was first surveyed and approved by GOOT archaeologists (Mcintosh and Duff 2002). At that time, the project consisted of construction of four passing lanes along US 78/SR 10 In Oglethorpe and Wilkes Counties. The project would begin at M.P. 13.7, with lane #1 westbound terminating at M.P. 15.0. Lane#2 eastbound begins at M.P. 15.30, ending at M.P. 16.7, both in Oglethorpe County. Lane #3 eastbound would extend from M.P. 0.0 to M.P. 1.5 in Wilkes County, while lane #4 eastbound would extend from M.P. 5.5 to M.P. 7.0 in Wilkes County. Total project length is approximately 6.20 miles. Existing right-of-way along US 78/SR 10 is 100 feet. Additional required right-of-way varies in width from 20.50 feet. In 2007 the project was changed and an additional easement along passing Jane #1 varying from 60-95 feet in width from the on the east side of US 78/SR 10 was surveyed and approved (Mustonen 2007).