Back to top

Phase I Archaeological Survey of the Intersection of SR 119 and SR 17 in Effingham County, Georgia

Author(s)
Report Number
8934
Year of Publication
1997
County
Abstract

The proposed project is located in Effingham County in the City of Guyton at the intersection of SR 119/Springfield Avenue and SR 17/Central Boulevard. The project consists of intersection reconstruction into a single-lane, modern roundabout configuration.  The purpose of the project is to improve operational efficiency and safety. The existing SR 119/Springfield Avenue is classified as a rural, minor arterial and consists of two 12-foot travel lanes (one in each direction) and 7-foot unpaved shoulders. The existing SR 17/Central Boulevard is classified as a rural, major collector and consists of two 12-foot travel lanes (one in each direction) and 5 to 7-foot unpaved shoulders. The posted speed is 45 miles per hour (mph). The existing ROW width is approximately 60 feet. The proposed roundabout would consist of a single-lane with curb and gutter, and would have a speed limit of 35 mph.  The proposed ROW width along SR17/Central Boulevard would increase to 151 feet while the ROW along SR 119 remain at 60 feet. The proposed project length is approximately 0.5 mile.