Back to top

Archaeological Reevaluation of Project EDS00-0500-00(005), Bartow County

Author(s)
Report Number
9198
Year of Publication
2010
Abstract

This project proposes to provide a new US 411 to I-75 connection by constructing a 7.31 mile long freeway on new location between the existing US 411/US 41 interchange and existing SR 20 east ofl-75, with a new interchange at I-75. An interchange with existing US 411 is also proposed. Recent changes made to the project corridor shift the CR 267/Simpson Circle tie-in to SR 20 to the north and outside of the area previously surveyed (see attached location map).