Archaeological Assessment of Medians and Striping on SR 6/Camp Creek Parkway, Fulton County

Author(s)
Report Number
9206
Year of Publication
2009
Abstract

The proposed project would consist of the removal of 12 feet of existing grass median along SR 6/Camp Creek Parkway to construct an additional lane. The project would also eliminate a portion of the striping around the concrete islands at the SR 6/Camp Creek Parkway/North Commerce Drive intersection to create a third westbound through lane. The total length of the project would be approximately 0.70 mile. All work would occur within the existing right-of-way. An archaeological survey consistent with the proposed project description was conducted along the entire length of the project corridor.