Addendum Survey for the Phase I Archaeological Survey for the Proposed Widening of SR 120/Abbotts Bridge Road, Fulton and Gwinnett Counties, Georgia

Author(s)
Report Number
9661
Year of Publication
2017
Abstract

The proposed GDOT Project would widen SR 120/Abbotts Bridge Road from SR 141/Medlock Bridge Road to Peachtree Industrial Boulevard from two through lanes to four through lanes. The total project length is approximately 2.5 miles, which Includes a 1,500-foot lie-in to SR 120 west of SR 141 and a 1,000-foot tie-in east of Peachtree Industrial Boulevard. To accommodate additional turning movements, both SR 141 and Peachtree Industrial Boulevard would be improved and widened for approximately 1,000 feet in each direction approaching SR 120. Parson Road would also be improved and widened for 1,250 feet south of SR 120, and is proposed to include a roundabout at the Parson Road/Wilson Road intersection. Boles Road would be improved for 1,000 feet north of SR 120. These improvements would also accommodate additional turning movements. All other side roads would be improved to a maximum of 500 feet from SR 120. The existing SR 120 bridge would be widened and/or reconstructed across the Chattahoochee River. All signalized intersections would be modified, but no additional signals would be necessary along the project corridor. Existing ROWs within the project corridor are approximately 60 to 130 feet wide. Proposed ROWs would be approximately 104 to 140 feet wide.