234
|
Roberts, Joseph
|
Addendum to the Proposed SR 96 Lighting & Landscaping for the City of Reynolds, Taylor County, Georgia
|
The proposed Georgia Department of Transportation (GDOT) Project CSHPP-0007-00(606), PI No. 0007606 proposes to construct landscaping, lighting, and pedestrian amenities along the Fall Line Freeway/State Route (SR) 96 within the city limits of Reynolds, Georgia.
|
Taylor
|
2015
|
7436
|
Roberts, Joseph
|
Phase I Archaeological Survey of CR/299 Omega Road from SR 35/US 319 to I-75, Tift County, GA
|
The proposed project would improve County Road (CR) 299/Omega Road to State Route standards from State Route (SR) 35/US 319 (MP 0.00) to I-75 (MP 0.30) for a total distance of approximately .3 mile in Tift County, Georgia. This section of roadway would be designated as a SR 35 Connector.
|
Lumpkin
|
1998
|
7557
|
Roberts, Joseph
|
Phase I Archaeology Survey for SR 171/US 221 Little Ohoopee River Bridge Replacement
|
The proposed project would consist of the replacement of GDOT Bridge 167-0027-0, which is located on US 221/SR 171 over the Little Ohoopee River, approximately 2.7 miles north ofKite, Georgia (refer to Figure 1 ).
|
Tattnall
|
1984
|
7960
|
Roberts, Joseph
|
Phase I Archaeological Survey for the Proposed SR 384/Duncan Bridge Road at CR 382/Pea Ridge Road Roundabout, Habersham County, Georgia
|
On September 17th and 18th, 2014, Edwards‑Pitman Environmental, Inc.
|
DeKalb
|
2011
|
7975
|
Roberts, Joseph
|
Phase I Archaeological Survey of the Proposed Elliott Road Bridge Replacement at Walnut Creek, Henry County, Georgia
|
The proposed project would consist of replacing the structurally deficient two‑lane bridge at CR 131/EIIiott Road over Walnut Creek approximately .50 mile northeast of the City of McDonough in Henry County.
|
Elbert
|
2013
|
8053
|
Roberts, Joseph
|
Addendum to Phase I Archaeological Survey of the Proposed Operational, Bicycle/Pedestrian, and Streetscape Improvements to Hardin Street/O'Kelly Street in Conyers, Rockdale County, Georgia
|
This project intends to improve two streets in Rockdale County, Georgia. The proposed project would consist of upgrading Hardin Street/O'Kelly Street in Conyers, Georgia, to include provisions for continuous bicycle and pedestrian facilities and to improve the operations of the corridor.
|
Clayton
|
2012
|
8065
|
Roberts, Joseph
|
Phase I Archaeological Survey for Proposed Donald Lee Hollowell Parkway Improvements, Fulton County, Georgia
|
The proposed improvements will construct 9-foot multi-use paths, including a 4 foot bicycle lane and a 5 foot pedestrian sidewalk, and a 6 foot tree-planting zone along Donald Lee Hollowell (Hollowell) Parkway.
|
Newton
|
2014
|
8161
|
Roberts, Joseph
|
Addendum to Phase I Archaeological Survey of the South Fork Peachtree Creek Trail Phase IV, DeKalb County, Georgia
|
A total of three previously recorded archaeological sites are located within a 1-kilometer radius of the corridor. Site 9DA352 (recordation date unknown) is located 350-meters outside of the APE, and is a lithic scatter of unknown eligibility for the National Register of Historic Places (NRHP).
|
Fulton
|
2014
|
8200
|
Roberts, Joseph
|
Phase I Archaeological Survey for SR 16 at SR 54 Intersection Improvements, Coweta County, Georgia
|
In February 2014 and April 2015, Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey of State Route (SR) 16 at SR 54 in Coweta County, Georgia (Georgia Department of Transportation [GDOT] Project No. NH000-0022-01[023], P.I. No. 332180, HP No. 140113-003).
|
Appling
|
2013
|
8206
|
Roberts, Joseph
|
Phase I Archaeological Survey for the Proposed SR 83 over the Towaliga River Bridge Replacement, Monroe County, Georgia
|
On October 15th and 16th, 2014, Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey of the proposed State Route (SR) 83 over the Towaliga River bridge replacement in Monroe County, Georgia (Georgia Department of Transportation [GDOT] Project No.
|
Atkinson
|
2013
|