10886 Roberts, Joseph Tenth and Final Reevaluation of the Northwest Corridor Project, Cobb County, Georgia

Project Changes for Reevaluation 10 (February 2018): P.I. No.: 0008256. The proposed project has changed to reflect the refined design location of one proposed sound barrier along the 1-75 corridor.

Cobb County, GA 2018
11850 Roberts, Joseph Phase I Archaeological Survey for the Proposed SR 165 at Sugar Creek Bridge Replacement, Dodge County, Georgia

On July 27, 2017, Edwards-Pitman Environmental, Inc. (EPEI) conducted a survey of roughly .4 mile of SR 165 for the proposed bridge replacement at Sugar Creek in Dodge County, Georgia (Georgia Department of Transportation [GDOT] P.I. No. 0013823).

Dodge County, GA 2018
12391 Roberts, Joseph, Hitt, Kaitlen Phase I Archaeological Survey for a Proposed ATMS System Expansion in Paulding County, Georgia

The proposed ATMS expansion project would consist of the design and installation of Intelligent Transportation Systems (ITS) infrastructure and ITS sub-system components in Paulding County, Georgia.

Paulding County, GA 2018
12426 Roberts, Joseph Phase I Archaeological Survey for the Proposed SR 230 at Big Branch Creek Bridge Replacement, Dodge County, Georgia

On July 25-27 2017, Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey for the proposed State Route (SR) 230/Lower River Road at Big Branch Creek bridge replacement, in Dodge County, Georgia (Georgia Department of Transportation [GDOT] P.I. No. 0013824).

Dodge County, GA 2018
13074 Roberts, Joseph Phase I Archaeological Survey for Surplus Tract #3373, Polk County, Georgia

The proposed project includes the sale of three parcels of land, totaling 91.35 acres (parcel 10R is 9.08 acres, parcel 11A is 44.37 acres, and parcel 11R is 37.9 acres), that are currently owned by the Georgia Department of Transportation (GDOT).

Polk County, GA 2017
13090 Roberts, Joseph Phase I Addendum Archaeological Survey for the Proposed I-85 Interchange Construction, Bridge Replacement, and Roundabout, Troup County, Georgia

Between November 9 and December 4, 2017, Edwards-Pitman Environmental, Inc.

Troup County, GA 2018
13714 Roberts, Joseph Phase I Archaeological Addendum Survey of SR 67 from Interstate 16 to Statesboro Bypass

The proposed project would begin approximately .4 mile south of I-16 and extend north to just south of County Road (CR) 585 (Burkhalter Road) in Bulloch County. The primary purpose of this project is to relieve congestion and improve conditions for traffic between Statesboro and I-16.

Bulloch County, GA 2017
14585 Pietak, Lynn Marie, Roberts, Joseph PHASE I ARCHAEOLOGICAL SURVEY OF I-85 AT SR 138/JONESBORO ROAD INTERCHANGE RECONSTRUCTION AND WIDENING, FULTON COUNTY, GEORGIA

A Phase I archaeological survey was conducted between July 2015 and June 2018 of the proposed Interstate (I-) 85 at State Route (SR) 138 Jonesboro Road interchange widening and reconstruction by Edwards-Pitman Environmental, Inc.

Fulton County, GA 2019