9294 Roberts, Joseph Phase I Archaeological Survey of the Proposed Fairburn Streetscapes, Fulton County, Georgia

The project limits include a five block stretch on US 29 from Malone Street to approximately 175 feet north of Strickland Street, and a section of East Broad Street from Smith Street to Campbellton Street. The project length is approximately 2,575 feet (.48 mile).

Fulton 2016
9500 Roberts, Joseph Addendum Report for Phase I Archaeological Survey for ATMS Upgrades to 30 Intersections in Fulton County, Georgia

The project would include the installation of equipment and software needed to implement adaptive traffic signal management, known as an Advanced Transportation Management System (ATMS), including vehicle count stations and vehicle detection devices.

Fulton 2016
9517 Roberts, Joseph Phase I Addendum Archaeological Survey of Moreland Avenue at Glenwood Avenue Intersection Improvement in DeKalb and Fulton Counties, Georgia

SR 260/Glenwood Avenue (Glenwood Avenue) would be realigned to the south in order to eliminate the approximate 70-foot offset that currently exists as it crosses US 23/SR 42/Moreland Avenue (Moreland Avenue).

DeKalb 2017
9651 Roberts, Joseph Phase I Archaeological Survey for the widening of I-16 and I-95 Interchange Reconstruction, Chatham County, Georgia

I-16 improvements would include the addition of one general purpose lane along both I-16 eastbound and westbound between I-95 and I-516.

Chatham 2017
9661 Roberts, Joseph Addendum Survey for the Phase I Archaeological Survey for the Proposed Widening of SR 120/Abbotts Bridge Road, Fulton and Gwinnett Counties, Georgia

The proposed GDOT Project would widen SR 120/Abbotts Bridge Road from SR 141/Medlock Bridge Road to Peachtree Industrial Boulevard from two through lanes to four through lanes.

Fulton 2017
9669 Roberts, Joseph Phase I Archaeological Survey for CID Commuter Trails, DeKalb and Fulton Counties, Georgia

The proposed project would construct multi-use commuter trails at two locations in Fulton and DeKalb counties.

DeKalb 2017
9678 Roberts, Joseph Phase I Addendum Archaeological Survey of the Proposed Roundabout at Jodeco Road at Blackhall Road/Longwood Drive in Henry County, Georgia

The proposed project is located in Henry County at the intersection of Jodeco Road and Blackball Road/Longwood Drive. The existing intersection of Jodeco Road and Blackball Road is unsignalized and controlled with a stop movement along Blackball Road.

Henry 2017
9693 Roberts, Joseph Phase I Archaeological Survey For the Proposed Widening of SR 120/Abbotts Bridge Road, Fulton and Gwinnett Counties, Georgia

A Phase I archaeological survey was conducted on April26-29, 2016 and November 7, 2016 for the proposed widening of SR 120 (GDOT Project No. STP00-0189-01(010), P.I. No. 721000, HPNo. 140204-011) in Fulton and Gwinnett counties, Georgia (Figure 1.1).

Fulton 2017
9829 Roberts, Joseph Phase I Archaeological Addendum Survey for SR 32 over Bear Creek Bridge Replacement, Coffee County, Georgia

The purpose of the project is to replace a structurally deficient bridge on SR 32 over Bear Creek in Coffee County, Georgia (see Figure 1). Existing SR 32 at Bear Creek is a two-lane, rural road, with 12-foot wide travel lanes and paved shoulders that vary from 2 to 4 feet wide.

Coffee 2017
10044 Roberts, Joseph GDOT ARCHAEOLOGICAL SHORT FORM FOR NEGATIVE FINDINGS: Phase I Archaeological Survey for the Proposed SR 224 Passing Lanes, Macon County, Georgia.

The Passing Lanes Project for State Route (SR) 224 in Macon County, Georgia, proposes to construct passing lanes along SR 224 from the intersection of SR 26 to the Macon County Line to facilitate the movement of cars and freight from Montezuma to T-75 and additional points north.

Macon 2016