Archaeological Survey of Project STP-076-1 (28), Columbia County

Author(s)
Report Number
8331
Year of Publication
2014
Abstract

The proposed project would construct a southbound passing lane on SR 47 beginning at the intersection of CR 46 and ending just north of the existing bridge over Keg Creek. Existing right-of-way varies from 100 to 150 feet and an additional 10 to 20 feet of right-of-way would be required. A 100 foot wide temporary detour would also be required on the west side of SR 47 for approximately 2655 feet. The total project length is approximately 1.4 miles.