Back to top

Operational Improvement on 5141 SB/ Peachtree Parkway SB at Peachtree Industrial Boulevard SB

Author(s)
Report Number
8712
Year of Publication
2011
County
Abstract

The proposed project involves the addition of a second lane from SR141 southbound onto the limited access portion of Peachtree Industrial Boulevard southbound by constructing a new lane on the left shoulder of the existing lane from SR141 SB onto Peachtree Industrial Boulevard; restriping the southbound departure lanes on SR 141 south of Holcomb Bridge Road with the purpose of turning the existing left lane into a new left lane, the middle lane into an option lane to the existing lane onto Peachtree Industrial Boulevard or to SR140, and the right lane continues to SR 140; and restriping the merge area between the existing lane from SR 141 and Peachtree Industrial Boulevard with the purpose of turning the new left lane from SR 141 into the existing center lane on Peachtree Industrial Boulevard. This project will also involves construction of a new lane on the left shoulder of Peachtree Industrial Boulevard southbound, from the underpass under the flyover from Peachtree Industrial Boulevard to SR 141 northbound, to the Peachtree Industrial Boulevard south of Holcomb Bridge Road with the purpose of turning the existing left lane into the new left lane and the existing right lane into the existing left lane; and merging of the new left lane into the existing left lane prior to the Peachtree Industrial Boulevard Bridge over SR140. The project begins roughly 500 feet south of S.R. 141/ Peachtree Pkwy from the center of the intersection at S.R. 141/Peachtree Pkwy/ S.R. 140/ Holcomb Bridge Rd. and ends 300 feet west of Jimmy Carter Boulevard.