Back to top

Addendum to Phase I Archaeological Survey of Gwinnett County Safe Routes to School

Author(s)
Report Number
8902
Year of Publication
1991
Abstract

This project consists of pedestrian improvements in the vicinity of Lawrenceville and Margaret Winn Holt Elementary Schools in Gwinnett County, Georgia. New crosswalks, curb ramps, pedestrian refuges and count-down pedestrian signal heads will be Installed at the intersections of State Route (SR) 120/West Pike Street at Langley Drive, Langley Drive at US Highway (US) 29/SR 8/W Crogan Street, and Moon Road at SR 124/Scenic Highway.

The existing crosswalk near Lawrenceville Elementary School on Gwinnett Drive will be upgraded with improved signage and markings, and new crosswalks with curb ramps will be installed at the unsignalized intersections of Moon Road at Old Snellville Highway and Moon Road at Charleston Lane.

New sidewalk will be Installed on the west side of West Crogan Street/SR 8/US 29 from the Intersection with Langley Drive to the Intersection of Ridgecrest Drive, and along the west side of Ridgecrest Drive from West Crogan Street/SR 8/US 29 to Stark Street. New sidewalk will be Installed on the east side of Stone Mountain Street from Gwinnett Drive to Salem Drive, and on the west side of Stone Mountain Street from Gwinnett Drive to Constitution Boulevard and Nottingham Drive to Somerset Drive. Existing gaps in sidewalk will be completed along the north side of Moon Road from SR 124/Scenic Highway to Davis Road, and along SR 124/Scenic Highway from Channel Drive to Moon Road.

All sidewalks would be 5-feet wide, constructed within the existing ROW, and would comply with the Americans with Disabilities Act (ADA), Public Right-of-Way Accessibility Guidelines (PROWAG), and Manual on Uniform Traffic Control Devices (MUTCD) requirements. Curb cuts, curb and gutter, and signage would be placed and/or replaced along the border and where needed.