The proposed work consists of milling, resurfacing, loop detectors, rumble strips, striping, raised pavement markers and curb cuts along a 6.723 mile section of SR 26/SR 67 in Bulloch County (Figure-1), The proposed project would begin at the north end of the Mill Creek bridge approach slab joint to the pavement joint 485 feet east of CS 619/North College Street (MP 10.955 to MP 17.678). The project will take place within existing right-of-way (ROW) which varies throughout. The limits of construction will be five feet from the edge of pavement.