Back to top

Carlock, Michael D.

Report Number Author(s) Title Abstract Summary County Year
7832 Carlock, Michael D. Phase I Archaeological Survey for the Proposed Bridge Replacement over House Creek on US 129/SR 11 in Ben Hill County, Georgia

This report presents the results of Phase I archaeological survey conducted for Georgia Department of Transportation (GDOT) project PI No. 0011676, in Ben Hill County, Georgia. The proposed project would replace the substandard bridge on US 129/SR 11 over House Creek.

Tift 2013
8000 Carlock, Michael D. Ramp Improvements on SR 400 Southbound at SR 140/Holcomb Bridge Road, Fulton County, Georgia

The proposed project limits extend along the southbound SR 400 entrance ramp where SR 400 transitions from four lanes to three lanes and continues northward until reaching approximately 1000 feet beyond the SR 400 southbound exit ramp (Figures 1 and 2).

Towns 2012
8001 McKay, Melissa, Carlock, Michael D. SR 362 at CR 507/Rover Zetella Road/Moreland Road

Original Project Description: The intersection of State Route (SR) 362 at County Road (CR) 507 is located approximately 3.0 miles southwest of the interchange of SR 3/US 19/41 and 1.54 miles northeast of the Pike County Line on SR 362 in Spalding County.

Grady 1997
8003 Perrine, Rachel, Williams, Siska, Carlock, Michael D. SR 92 at SR 14 Alternate South Fulton Parkway

The intersection of SR 92/Campbellton Fairburn Road and SR 14/South Fulton Parkway is located in Southwest Fulton County.

Grady 1999
8010 Falvey, Lauren W., Baughman, Pamela J., Carlock, Michael D. Phase I Archaeological Survey for Proposed Culvert Replacement on State Route 22/U.S. 80 at Bailey Branch, Crawford County, Georga

The proposed project would consist of replacing the existing culvert on State Road (SR) 22/U.S. 80 at Bailey Branch eight miles west of Roberta, Georgia (Figure 1). The existing culvert will be replaced with a reinforced concrete bridge measuring 160 feet long. and 40 feet wide.

Greene 2013
8018 Carlock, Michael D. Proposed Bridge Replacement over Grove Creek on SR 59 in Banks County, Georgia

The proposed project would take place on SR 59 in Banks County, five miles north of Commerce, Georgia {Figures 1 and 2}. The existing typical section of SR 59 consists of two 12-foot travel lanes with no shoulders, one in each direction.

Hancock 1972
8092 Carlock, Michael D. Proposed Rehabilitation and Resurfacing of Crossgate Road from SR 21 to NS Railroad, Chatham County, Georgia

The proposed project consists of the resurfacing of Crossgate Drive between SR 21/Augusta Road and the Norfolk Southern Railroad (Figures 1-3) within the existing ROW.

Gwinnett 2014
8097 Carlock, Michael D. SR 30/SR 90 Widening to Four Lanes from East of I-75 to Midway Road in Cordele, Georgia

SR 30/SR 90/US 280 just east of 1-75 consists of a rural section with two 12 foot through lanes (one lane eastbound and one lane westbound) and a 14 foot continuous center turn lane with 10 foot rural shoulders.

Chatham 2012
8104 Carlock, Michael D. Maintenance and Minor Repair Including Curb Cuts on SR 21 from 0.20 Miles North of NS#916917C to Jacks Branch in Effingham County

The proposed project consists of maintenance and minor repair on SR 21 from Rincon to Springfield, Georgia. The project includes milling, resurfacing, patching, striping, and curb cuts. There are 12 curb cut (wheelchair) ramps to be constructed.

Putnam 2011
8106 Carlock, Michael D. Traffic Signal Installation at the Intersection of SR 105/US 441 and SR 15/US 23 Southbound Ramps

The proposed project involves the installation of a traffic signal at the intersection of SR 105/US 441 and US 23/SR 15 southbound ramps (Figures 1 and 2}.

Chatham 2012
Displaying 1 - 10 of 65