Back to top

Archaeological Reevaluation of BRST-154-1(12), Taylor and Crawford Counties; HP-000410-003

Author(s)
Report Number
9192
Year of Publication
2009
County
Abstract

The proposed project would replace the structurally deficient bridge on State Route 128 that crosses the Flint River on the Taylor/Crawford County line. The bridge would be constructed just south of the existing bridge. The proposed project is approximately 0.94 mile in length. Required right-of-way varies up to a maximum of 21 0 feet. This reevaluation was concerned with the movement of the proposed boat ramp from the south side of State Route 128 to the north side. An additional 25-125 feet of right-of-way would be required near the eastern project terminus for the construction of the boat ramp. An easement would also be required for construction of the boat ramp.