Back to top

Addendum - Phase I Archeological Resources Survey of Additional Right-of-way and Easements for Ridgewalk Parkway over I-575

Report Number
9210
Year of Publication
2009
Abstract

The project corridors were originally surveyed as the Woodstock Parkway Interchange in 2006 (Gantt 2006). The proposed project would construct a new full diamond interchange on 1-575 between the existing interchanges at Towne Lake Parkway (Exit 8) and Sixes Road (Exit 11) at the existing Woodstock/Ridgewalk Pkwy overpass. The proposed project would also realign Old Rope Mill Road to intersect with Ridgewalk Pkwy approximately 525 feet to the east of the existing intersection to accommodate the proposed interchange ramps. A new road, Parodi Place, will be constructed off Woodstock Pkwy. Part of this original project and the subject of this addendum, the Ridgewalk Parkway interchange selected alternative is currently being reevaluated. There are more defined construction limits requiring additional right-of-way and easements. These additional areas total approximately 10 acres. In addition, signage for the new interchange will be placed within the previously surveyed (Jordan and Bloom 2003) existing right-of-way of 1-575 between the Sixes Road interchange and the new interchange. Please see attached for additional information on the changes.