Tilley, Doug L.

Report Number Author(s) Title Abstract Summary County Year
1275 Webb, Robert S., Tilley, Doug L. Phase I Cultural Resources Survey, Laura Lake Dam Rehabilitation, Cobb County, Georgia

See Figure 1. This project will be permitted under the USACE Nationwide program. Proposed project includes construction of access road to Laura Lake Dam.

Cobb 2021
2398 Tilley, Doug L., Bloom, Jonathan A. Cultural Resources Survey of the Proposed 60 Acre Tussahaw Water Treatment Plant and Plumbing Station Site, Butts County, Georgia

None Present.

Butts 2003
2561 Tilley, Doug L., Bloom, Jonathan A. Cultural Resources Survey of the Proposed 186-Acre Soful Landfill Site, Fulton County, Georgia

R.S. Webb & Associates conducted a Phase I cultural resources survey of the proposed 75 hectare (ha; 186 acres) SoFul Landfill Site in south Fulton County, Georgia, from March 6 through March 14, 2003. The proposed landfill will occupy a 36 ha ©. 88 acres) parcel within this property.

Fulton 2003
2666 Tilley, Doug L., Bloom, Jonathan A. Phase I Archeological Resources Survey Franklin-Hart County Airport, Runway 26 Extension, Franklin County, Georgia

A Phase I archeological resources survey was conducted for the proposed 32.4 hectare (80 acre) Franklin/Hart County Airport Runway 26 Extension in Franklin County, Georgia.

Franklin 2003
2761 Tilley, Doug L., Jordan, William R. Phase I Archeological Survey of the Frank Cochran Drive Widening Project

The project corridor is 2.5 miles (4.0 km) long and 200 feet (61 m) wide, and follows the existing Frank Cochran Drive. The proposed project begins at the intersection of Frank Cochran Drive and State Route (S.R.) 196 (E. G.

Liberty 2004
2915 Tilley, Doug L., Gantt, Mary Elizabeth Phase I Cultural Resources Survey of the Webb Ginn Corners Tract, Gwinnett County, Georgia

R.S. Webb and Associates (RSWA) conducted a Phase I cultural resources survey of the proposed 57-acre [23.1 hectare (ha)] Webb Ginn Corners residential development in Gwinnett County, Georgia. The study was conducted for Wetland Ecological Consultants, L.L.C.

Gwinnett 2004
4267 Tilley, Doug L., Gantt, Mary Elizabeth Phase I Archaeological Resources Survey, Big Shanty Connector

The project area is corridor approximately 2,240 feet (683 m) long and 120-150 feet (37 wide, extending northeast from Barrett Lakes Boulevard to the intersection of George Busbee farkway and existing Big Shanty Road. The corridor crosses 1-75.

Cobb 2008
6218 Tilley, Doug L., Gantt, Mary Elizabeth Phase I Archeological Survey, Cobb Parkway North Streetscape and Pedestrian Improvements

The proposed project would provide pedestrian, streetscape, and landscape improvements on Cobb Parkway/US41/SR3 from just northwest of Spring Road/Circle 75 Parkway to just northwest of Hargrove Road/Herodian Way for a total length of 0.4 miles long (2,110 feet) (see attached location map).

Greene 2009
6219 Tilley, Doug L., Webb, Robert S. Phase I Archeological Survey of the Main Bridge and Overflow Structure Corridor, County Road 305 at the Big Satilla Creek, Appling and Pierce Counties, Georgia

The proposed project would replace the existing main bridge and overflow structure on County Road 305 over Little Satilla Creek. The main bridge limits begin at milepost 5.96 and end at milepost 6.16 for a total length of 0.20 miles. The structure is located at roadway inventory milepost 6.13.

Troup 2009
6220 Tilley, Doug L., Webb, Robert S. Phase I Archeological Survey of a Bridge Corridor, County Road 309 at Little Hurricane Creek, Pierce County, Georgia

The proposed project would replace the existing bridge on County Road 309 over Little Hurricane Creek. The bridge is 3.0 miles southeast of the Bacon County line on County Road 309 at Little Hurricane Creek in Pierce County. The structure is located at roadway inventory milepost 7.54.

Cobb 2009
Displaying 1 - 10 of 16