Back to top

Addendum Phase I Archaeological Survey of the Proposed Early Acquisition Parcel for Sugarloaf Parkway Extension II, Gwinnett County, Georgia

Author(s)
Report Number
9284
Year of Publication
2016
County
Abstract

The Sugarloaf Parkway Extension II proposes to extend Sugarloaf Parkway as a limited access four-lane freeway with a depressed 44-foot wide median from 1-85 to SR 316 (University Parkway). The proposed section would consist of two 12-foot travel lanes in each direction, a 44-foot depressed grassed median, 12-foot wide outside shoulders (1 0-foot paved and 2-foot grass) and 6-foot wide inside shoulders (4-foot paved and 2-foot grass). This section of new limited access freeway has interchanges at 1-85, SR 124 (Braselton Highway), Fence Road, and SR 316 (University Parkway). The project will also include an interchange at SR 316 and Harbins Road with collector-distributor roads along SR 316 between Sugarloaf Parkway and Harbins Road. Collector-distributor roads will also be included along 1-85 between SR 20 and the new interchange of SR 324. The project length includes 6.8 miles along the new alignment of Sugarloaf Parkway II; 3.3 miles of collector-distributor roads along 1-85 and 2.7 miles of collector-distributors along SR 316. The proposed new location right-of-way is a minimum of 200 feet and expands to as much as 2000 feet at the interchanges of Sugarloaf Parkway at SR 316 and at 1-85 (See Attachments). This survey was for an early acquisition parcel, which would be included in the project corridor. The parcel is an approximately 1-acre early acquisition parcel along the Sugarloaf Parkway Extension II project alignment. The parcel (ID R7095 013) is located at 2183 Braselton Highway between Willoughby Drive and Lena Carter Road.