Back to top

McCarley, Billy J.

Report Number Author(s) Title Abstract Summary County Year
427 McCarley, Billy J. Phase I Archaeological Survey of the West Kingsland Bypass, Camden County, Georgia

The proposed project would widen and improve Colerain Road (CR 61) from SR 40, west of Kingsland, to the 1-95 interchange to facilitate the Kingsland Bypass, a coastal evacuation route.

Camden 2015
7688 McCarley, Billy J. "Oconee Clark," A Phase I Archaeological Survey of the Proposed Telecommunications Site in Oconee County, Georgia

On March 22, 2014, a Phase I Archaeological Survey was performed of the proposed lease area and access for the Oconee Clark telecommunication facility located in Watkinsville, Georgia (UTM Zone 17, E283840/N3748081.9).

Oconee 2014
7825 McCarley, Billy J. Phase I Archaeological Survey of the Proposed Harmony Senior Living Community Project in Spalding County, Georgia

An intensive Phase I Archaeological Survey was conducted of the proposed Harmony Senior Living Community project located on the comer of SR 92/McIntosh Road and Cowan Road in Griffin, Georgia. (Fig. 1).

Cobb 2003
7895 McCarley, Billy J., Bazzill, Dina M. TCNS ID 98347 Proposed 195-Foot Monopole Telecommunications Structure (199 Foot Overall Height including Appurtenances)

Environmental Corporation of America (ECA) has completed an Archaeological Assessment for the federal undertaking at the subject site.

Bleckley 2013
7990 McCarley, Billy J. Phase I Archaeological Survey of the Proposed Berwick Telecommunications Facility in Savannah, Chatham County, Georgia

A Phase I archaeological survey was performed on May 2, 2015 of the proposed lease area and access (hereafter called survey area) of the Berwick telecommunication facility located in Savannah, Georgia (32º 1’ 58.01” N, 81º 13’ 33.05” W).

Fulton 2011
8056 McCarley, Billy J. Phase I Archaeological Survey of I-85 at SR 324 Interchange

The proposed project consists of the construction of a diamond interchange at Interstate 85 (1-85) and State Route 324 (SR 324).

Barrow 2013
8074 McCarley, Billy J. Phase I Archaeological Survey of the Proposed Arlington Communications Facility in Arlington, Calhoun County, Georgia

A Phase I archaeological survey was performed on April 19, 2015 of the proposed lease area, access, and guy anchor placements (ANC 1, 2, & 3) of the Arlington communication facility (hereafter called survey area) located in Arlington, Georgia ( 84º .

Douglas 2013
8083 McCarley, Billy J. Negative Findings Phase I Archaeological Survey of the Proposed Grand Cascade Telecommunications Facility in Suwanee, Forsyth County, Georgia

A Phase I archaeological survey was performed on April 14, 2015 of the proposed lease area and access of the Grand Cascade telecommunication facility located in Suwanee, Georgia (34º 6’ 57.8” N, 84º 6’ 47.9” W).

Fulton 2013
8096 McCarley, Billy J. Negative Findings Phase I Archaeological Survey of the Proposed Oconee Springs Telecommunications Lease and Access in Eatonton, Putnam County, Georgia

Subterraine performed an intensive Phase I archaeological survey on March 20, 2015 of the proposed lease area and access of the Oconee Springs telecommunication project located in Eatonton, Georgia (33º 20’ 41.2” N, 83º 12’ 41.5” W).

Fayette 2014
8101 McCarley, Billy J. Phase I Archaeological Survey of the Proposed Tomacheechee Telecommunications Facility in Rincon, Effingham County, Georgia

A Phase I archaeological survey was performed on May 2, 2015 of the proposed lease area, access, and utility easement (hereafter called survey area) of the Tomacheehee telecommunication facility located in Rincon, Georgia (32º 17’ 24.54” N, 81º 13’ 19.58” W).

Chattooga 2012
Displaying 1 - 10 of 164