Back to top

McCarley, Billy J.

Report Number Author(s) Title Abstract Summary County Year
9026 McCarley, Billy J. Phase I Archaeological Survey of the Proposed West Point Telecommunications Facility in West Point Harris County, Georgia

A Phase I archaeological survey was performed on August 27, 2015 of the proposed lease area, and access (hereafter also called survey area) of the West Point telecommunication facility located in West Point, Georgia (32° 51' 44.823" N, 85° 07' 50.398" W).

Floyd 1993
9027 McCarley, Billy J. Phase I Archaeological Survey of the Proposed Nero Telecommunications Facility in Kingston Bartow County, Georgia

A Phase I archaeological survey was performed on July 17, 2015 of the proposed lease area and access/utility easement (hereafter also called survey area) of the Nero telecommunication facility located in Kingston, Georgia (34º 14’ 13.24” N, 84º 59’ 59.53” W).

Towns 1999
9031 McCarley, Billy J. Addendum Phase I Archaeological Survey of the Proposed I-16/0ld River Road Interchange Effmgham County, Georgia

Moreland Altobelli (MA) performed an addendum Phase I archaeological survey of the proposed Area of Potential Effect (APE) and Expanded Survey Corridor (ESC) (hereafter called survey area) of the interchange improvements at I-16 and Old River Road (GDOT PI No. 0008613, GDOT Project No.

Greene 2000
9039 McCarley, Billy J. Phase I Archaeological Survey of the Proposed Pork Plate Telecommunications Facility in Columbus Muscogee County, Georgia

A Phase I archaeological survey was performed on July 18, 2015 of the proposed lease area and access/utility easement (hereafter also called survey area) of the Pork Plate telecommunication facility located in Columbus, Georgia (32º 32’ 25.37” N, 84º 57’ 25.23” W).

Gordon 1977
9043 McCarley, Billy J. Phase I Archaeological Survey of the Proposed Tomochichi Telecommunications Facility in Griffin Spalding County, Georgia

A Phase I archaeological survey was performed on July 18, 2015 of the proposed lease area, access/utility easement (hereafter also called survey area) of the Tomochichi telecommunication facility located in Griffin, Georgia (33º 15’ 20.47” N, 84º 09’ 48.00” W).

Bryan 1999
9067 Lim, Hyun-Woo, McCarley, Billy J., Carter, Sam Cultural Resource Survey Proposed Telecommunications Tower Site Site Name: Summer Grove Newnan, Coweta County, GA

On behalf of Cellco Partnership and its controlled affiliates doing business as Verizon Wireless (Verizon Wireless), Terracon Consultants, Inc. (Terracon) conducted a Cultural Resource Survey (CRS) for the proposed Summer Grove telecommunications site located in Coweta County, GA.

Harris 2011
9243 McCarley, Billy J. Phase I Archaeological Survey of the Proposed State Route (SR) 400 at McGinnis Ferry Road Interchange Forsyth and Fulton Counties, Georgia

Moreland Altobelli (MA) performed an intensive Phase I archaeological survey of the proposed Area of Potential Effect (APE) and Expanded Survey Corridor (ESC) (hereafter called survey area) of SR 400 and McGinnis Ferry Road Interchange (GDOT PI No. 0007526, GDOT Project No.

Forsyth 2016
9284 McCarley, Billy J. Addendum Phase I Archaeological Survey of the Proposed Early Acquisition Parcel for Sugarloaf Parkway Extension II, Gwinnett County, Georgia

The Sugarloaf Parkway Extension II proposes to extend Sugarloaf Parkway as a limited access four-lane freeway with a depressed 44-foot wide median from 1-85 to SR 316 (University Parkway).

Gwinnett 2016
9295 McCarley, Billy J. Second Addendum of Phase I Archaeological Survey of the Proposed Two Interchanges on Interstate 75, SR 7 and SR 122

Moreland Altobelli Associates, Inc (hereafter called MAAI) performed a second addendum Phase I archaeological survey of two interchanges (SR 7 and SR 122) along Interstate 75 (I-75) in September 2016.

Lowndes 2016
9488 McCarley, Billy J. Phase I Archaeological Survey of the Proposed Sardis Telecommunications Facility in Sardis

Subterranean Consultants (STC) performed a Phase I archaeological survey of the proposed Sardis telecommunications facility lease area, access/utility easement, and guy wire easements (hereafter also called survey area) on December 20, 2015.

Burke 2015
Displaying 41 - 50 of 164