10045 McCarley, Billy J. Phase I Archaeological Survey of the Proposed Lula Telecommunications Facility in Lula Banks County, Georgia

A Phase I archaeological survey was performed on August 29, 2015 of the proposed lease area, access/utility easement, and three proposed guy wire easements (hereafter also called survey area) of the Lula telecommunication facility located in Lula, Georgia (34º 22’ 46.05” N, 83º 39’ 09.76” W).

Banks County, GA 2015
10053 McCarley, Billy J. Archaeological Assessment of the Cedarcrest Rock telecommunications facility in Dallas, Paulding County, Georgia.

Subterranean Consultants (STC) has completed a visual archaeological assessment of the proposed Cedarcrest Rock telecommunications project area on April 28, 2016.

Paulding County, GA 2016
10056 McCarley, Billy J. Addendum Phase I Archaeological Survey of The Proposed East Kingsland Bypass Camden County, Georgia

Moreland Altobelli Associates, Inc. (MAAI) conducted a Phase I Archaeological Survey for the proposed East Kingsland Bypass in 20 I 0 on behalf of the Georgia Department of Transportation (GDOT) (Koch 2010).

Camden County, GA 2016
10068 McCarley, Billy J. Cultural Resources Assessment of the Proposed Amerson- Riverside Connector Trail in Macon Bibb County, Georgia

Moreland Altobelli Associates, Inc (MAAI) conducted a cultural resources survey for the Amerson-

Riverside Trail Connector on March 6, 2017. The study was conducted for the city of Macon to locate and

Bibb County, GA 2017
10069 McCarley, Billy J. Phase I Archaeological Survey of the Proposed Baroucha Telecommunications Facility in Thomaston, Upson County, Georgia Direct Effects

A Phase I Archaeological survey of the proposed Baroucha telecommunications project was performed on February

10, 2015 in compliance with Section 106 of the National Historic Preservation Act of 1966, as amended. The

Upson County, GA 2015
10087 McCarley, Billy J., McReynolds, Nancy K. Notification of Site Modifications for a Previously Submitted Telecommunications Tower Review (HP-140606-002)

Cellco Partnership and its controlled affiliates doing business as Verizon Wireless (Verizon Wireless), are proposing to construct a telecommunication tower at the above-referenced location.

Clayton County, GA 2015
10226 McCarley, Billy J. Second Addendum Phase I Archaeological Survey for Sugarloaf Parkway Extension II Early Acquisition Parcel R7136-001 at 2496 Sunny Hill Road , Gwinnett County, Georgia

Early acquisition parcels, as they pertain to Federal Highway Administration (FHWA) projects, are sections of land that lie within proposed Right-of-Way (ROW).

Gwinnett County, GA 2018
10347 McCarley, Billy J. Addendum Phase I Archaeological Survey of I-85 at SR 324 Interchange, Gwinnett County, Georgia

The proposed project consists of the construction of a diamond interchange at Interstate 85 (I-85) and State Route 324 (SR 324).

Gwinnett County, GA 2018
10880 McCarley, Billy J. Phase I Archaeological Survey of Harper Street Railroad Crossing Closure and Cobb Street Improvements in Fulton County, Georgia

The project proposes to close one railroad crossing (Harper Street crossing), improve another {Vine Street crossing), and widen and improve Cobb Street, all immediately adjacent to US29/SR154.

Fulton County, GA 2018
10884 McCarley, Billy J. Phase I Archaeological Survey for Early Acquisition Parcel 7060-001 at 2300 Old Peachtree Road, Gwinnett County, Georgia

Early acquisition parcels, as they pertain to Federal Highway Administration (FHWA) projects, are sections of land that lie within proposed Right-of-Way (ROW).