Back to top

Phase I Archaeological Survey of Proposed Maintenance Improvements along SR 1 from Hamilton Street to South of the Beech Creek Bridge in Troup County, Georgia

Report Number
9556
Year of Publication
2016
Abstract

The proposed work consists of milling, patching, resurfacing, striping, and raised pavement markers, and curb cuts along a 4.15 mile section of SR 1 in Troup County (Figure 1). The proposed project would begin at Hamilton Street in LaGrange and end 1870 feet south of the Beech Creek Bridge (MP 16.232- MP 20.382). The project will take place within existing right-of-way (ROW) which varies throughout. The limits of construction will be five feet from the edge of pavement.