Back to top

Archaeological Assessment of the Stephens County Resurfacing Project

Author(s)
Report Number
10132
Year of Publication
2003
Abstract

This proposed project is 7.98 miles in length and consists of leveling, resurfacing. shoulder building, and permanent striping of SR 17 beginning at MP 0.00 at the Stephens/Franklin County line and ending at the intersection on SR 17 Alt. at MP 7 .98. No additional right-of-way is required.

Pursuant to the February 2000 Memorandum of Understanding (MOU) between the Federal Highway Administration (FHWA), the State Historic Preservation Officer of the Georgia Department of Natural Resources (SHPO), and the Georgia Department of Transportation, this project is considered an undertaking as defined in 36 CFR 800.16(y), however, it has been determined there is no potential to affect historic properties included in or considered eligible for inclusion in the National Register of Historic Places.