Back to top

Archaeological Assessment of the Butts/Henry County Bridge Maintenance Project

Author(s)
Report Number
10559
Year of Publication
2005
Abstract

This proposed project involves two separate bridges. The Hampton Road Bridge over 1-75 in Henry County is proposed to have its bridge deck hydo-demolitioned down to below its top mat of reinforcement. The bridge will then be overlaid with concrete and its edge beams and joint seals replaced. The Cabin Creek Road Bridge over 1-75 in Butts County is proposed to have its entire bridge deck replaced. All work will be restricted to the bridge deck surfaces. No new right-of-way is required. Project CSNHS-M002-00(785) is a bridge maintenance project on Hampton Road over 1-75 in Henry County, Georgia. The project involves hydro-demolition of deck surface to below the top mat of reinforcement and overlay with concrete. Replacement of edge beams and joint seals will also take place. In addition, all construction debris is to be contained and removed as per specifications.