Project STP-005-2(19) would widen SR 19/US 41 in Lamar County, Georgia. The project would also include intersection improvements at CR 63 and CR 64. The project begins at the Lamar/Monroe County line and terminates approximately 0.38 mile east of the SR 19/US 41 /CR 64 intersection. The existing right-of-way for SR 19/US 41 is I 00 feet. The required right-of-way for SR 19/US 41 varies with a maximum of 150 feet. The existing right-of-way for CR 63 and CR 64 is approximately 60 feet. The required right-of-way for both varies with a maximum of 40 additional feet. The total length of the project is 2.08 miles. An archaeological survey consistent with the proposed project description was conducted along the entire length of the project corridor.