Back to top

Archaeological Assessment of a Heard County Resurfacing Project

Author(s)
Report Number
10685
Year of Publication
2006
Abstract

This proposed project consists of the milling, patching, leveling and resurfacing of SR 34 beginning at SR 1/US 27 and ending at the Coweta County Line. All work will take place within the existing right-of-way with no new right-of-way required. Total project length is approximately 8.23 miles Pursuant to the February 2000 Memorandum of Understanding (MOU) between the Federal Highway Administration (FHW A), the State Historic Preservation Officer of the Georgia Department of Natural Resources (SHPO), and the Georgia Department of Transportation, this project is considered an undertaking as defined in 36 CFR 800.16(y), however, it has been determined there is no potential to affect historic properties included in or considered eligible for inclusion in the National Register of Historic Places.