Back to top

Archaeological Assessment of a Columbia County Resurfacing Project

Author(s)
Report Number
10706
Year of Publication
2006
Abstract

This project consists of the resurfacing, milling, leveling, patching, and shoulder building of SR 150 beginning at SR 104/4 7 and ending at the South Carolina County Line. All work will take place within the existing right-of-way with no new right-of-way required. Total project length is approximately 8.64 miles. Pursuant to the February 2000 Memorandum of Understanding (MOU) between the Federal Highway Administration (FHW A), the State Historic Preservation Officer of the Georgia Department of Natural Resources (SHPO), and the Georgia Department of Transportation, this project is considered an undertaking as defined in 36 CFR 800.16(y), however, it has been determined there is no potential to affect historic properties included in or considered eligible for inclusion in the National Register of Historic Places.